Introducing eCorpOne solar energy plant development

We design, buy land/equipment/items, invest, and manage the solar energy plants.

Analyze environment, calculate, and optimize investments

We maximize efficiency of investment by optimizing sources and design.

Pile centering and stakeout location determination

Where to insert screws and layout of solar panels are decided based on environmental analysis, including location of utility poles, condition of the ground, and other obstacles making their shadows.

Electrical system design

After analyzing the environment (movement of utility poles, ground, other obstacles and their shadows), we will optimize circuit design.

Tracking of solar energy production and efficiency during business

We monitor energy output and efficiency during business. We make sure that solar energy plant is producing electricity at optimal performance.

Inashiki Power Station

We have built a power plant that combines carport + building + warehouse roof.

Sakuragawa plant

It was a difficult construction work due to a lot of obstacles hidden underground.

Nasu shiobara plant

A lot of waste illegally left to the ground required a lot of additional work meeting strict Japanese waste management laws.

Toride plant

We converted agricultural land into the generic.

Minami Aizu plant (Construction in progress as of May 2020)

We purchased EPC land. Difficult construction work due to the nature of the land having a lot of rocks. Destroyed existing houses and reuse of concrete base.

We develop a new solar energy plant. Existing buildings have been removed.

Kamisu Warehouse (Construction in progress as of May 2020)

We will install solar panels on top of the roof. Entire roof has been replaced to new one.

老朽化した雨漏りの激しい屋根